Tuesday, December 16, 2008

How To Do Nice Bangs With Weave

Another year ... The boundary

We are late with updates, but not with the construction.
While the sea and wind contribute to winter, the 2008 is about to end, and year of the launch of the crop "Santa Maria del Lauro" is coming.
We chose to celebrate its first year of the boat with a timetable for friends and lovers of the sea, wood, wind and lateen sail with a calendar.
For calendar 2009, the image is that of the boat in the middle of construction, the completion dell'ossatura and the beginning of the plating.
But the year the crop will be 2008: the storm of November 20 has invaded the cave, without causing damage, but the sea water has washed the incomplete hull of the boat.
goiter a sail "Santa Maria Lauro's "has not been launched yet, but it was christened by the storm.

Wednesday, November 5, 2008

Couch Colors For Dark Wood Floors




Now that the frames were fixed to the keel, and were made in" good shape "to be temporary structures, it is possible begin to lay the planking. The wooden boat is not just a roof (watertight, if possible) dell'ossatura, but a part of it. The first table, called "boundary", is fundamental to keeping the boat as a whole, and to reinforce it is coupled to another table inside of the ribs, known as "dormant".

After being cut, again in the drawing, the mahogany table for the "wall" is immersed in hot water for a few hours. Then, still wet, the aft end is applied with the strictest in the stern, neat and tidy after the boat is folded along, thanks to the flexibility achieved by immersion in water. At this point, we have to establish that the ordinances are in place, straight and aligned, the board is drilled and nailed to the frames, and the table becomes the "boundary" of the boat. The procedure is repeated on the board, carefully measuring the symmetry of the table, and join the round-Straight and left to the stem.

Thursday, October 23, 2008

Mw2 Russian To English Fix



Applied to the keel, the frames are captured only by the nails: that is, not locked, they can rotate or fall off, and can not perform any structural function. They will be built around a series of structures that will end up stuck together and the keel so that no piece should support efforts alone.

In the meantime, however, you must lock them in place, giving the boat the "form" provided by the building plan.
With accurate measurements, the water lines are passed from garbi to order, and these are stopped in the longitudinal strips with the stringent, and then nailed.
skeleton, symmetric and rigid, it must be stopped in position flush with the slope of the cave, with the vertical axis to lead, propped up and locked. In that position you can work to the remaining structures, and the shell.